The consultant shall be responsible for the hydrogeological study and DPR for the full project area of around 50 villages in 5 Gram Panchayats.
List of Gram Panchayats- (Block – Binpur II, Jhargram)
· Bhelaidiha
· Shimulpal
· Bhulaveda (Bhula Bheda)
· Belpahari
· Sandapara
The scope of work shall include, but not be limited to, the following.
A0. Inception
- Review the project proposal, work plan, logical framework and the planned unit targets for water security works.
- Hold a kick-off meeting with TF and agree the micro-watershed boundaries, priority villages and data-sharing arrangements with the baseline survey agency.
- Prepare an Inception Report covering methodology, field plan, sampling of wells and test sites, team deployment, timelines and quality assurance.
Component A: Hydrogeological Characterisation and Micro-Watershed Delineation
A1. Desk review and secondary data
- Collect and review existing data: Central Ground Water Board (CGWB) and State Water Investigation Directorate (SWID), West Bengal reports and aquifer maps, NAQUIM outputs where available, Geological Survey of India maps, block-level groundwater assessment category, rainfall records, any earlier watershed DPRs for the area, and the water-source inventory and water quality data from the project's baseline survey.
- Obtain base layers: Survey of India toposheets (1:50,000), a digital elevation model (CartoDEM / SRTM, 30 m or finer), recent satellite imagery, land use/land cover, soil and geomorphology layers (e.g., Bhuvan / NRSC).
A2. Micro-watershed delineation and drainage mapping
- Delineate watershed and micro-watershed boundaries from the DEM, validated against toposheets and field observation; reconcile with official micro-watershed codes where they exist.
- Map the full drainage network and classify every drainage line by Strahler stream order, with slope, length and catchment area for each segment.
- Divide each micro-watershed into ridge, mid-slope and valley zones to support ridge-to-valley treatment planning.
- Produce thematic maps for each micro-watershed: drainage, slope, contour (at an interval suitable for structure design), geology, geomorphology, lineaments, soils and land use.
A3. Hydrogeological field investigation
- Traverse the main drainage lines on foot and record lithology, rock outcrops, weathered-zone thickness, fractures, lineaments, dykes and stream-bed material at regular intervals.
- Inventory existing open wells, bore wells and hand pumps (target: at least 200 wells across the 40 villages), recording location (GPS), depth, depth to water, construction, yield, use and seasonality.
- Measure pre- and post-monsoon water levels in a network of key observation wells, and establish this network for long-term monitoring by the Foundation.
- Conduct infiltration tests at representative sites across major soil and geology units (minimum 20 tests).
- Carry out geophysical surveys (vertical electrical sounding or electrical resistivity tomography) at priority sites, particularly proposed injection-well and check-dam locations (minimum 40 soundings).
- Collect and test groundwater samples at a NABL-accredited laboratory for basic potability and recharge-relevant parameters (pH, EC/TDS, hardness, chloride, nitrate, fluoride, iron, arsenic where relevant) from at least 40 sources, avoiding duplication with the baseline survey's testing.
- Record existing water harvesting and recharge structures, their condition and performance.
A4. Aquifer characterisation and recharge profile
- Define the aquifer type(s) (e.g., unconfined weathered zone, fractured hard rock, alluvial, confined), with geometry, thickness and water-bearing properties, illustrated with hydrogeological cross-sections.
- Estimate the groundwater balance for each micro-watershed (rainfall, runoff, recharge, draft and stage of extraction) using an approach consistent with the GEC-2015 methodology.
- Identify and map recharge zones, discharge zones and areas of over-extraction or water-quality concern.
- Prepare a recharge-potential zonation map combining field data with weighted GIS layers.
A5. Site identification and prioritisation
• Identify candidate sites for each structure type along drainage lines, matched to stream order, slope, geology and aquifer response, for example:
– Ridge and upper reaches (1st–2nd order): trenches, gully plugs, loose boulder structures.
– Mid reaches (2nd–3rd order): recharge trenches, percolation ponds, farm ponds.
– Lower reaches (3rd–4th order): check dams, nala bunds, recharge shafts or injection wells where a permeable zone is confirmed.
• Rank sites by expected recharge benefit, downstream beneficiaries, land availability and community preference.
• Validate shortlisted sites with Gram Panchayats and user groups, and record land ownership and consent status.
Component B: Detailed Project Report (DPR) Preparation
B1. Intervention plan
- Prepare a micro-watershed-wise treatment plan covering area treatment and drainage-line treatment from ridge to valley.
- For each structure: unique ID, GPS location, survey number or land details, drainage order, type, purpose and justification from the hydrogeological findings.
B2. Engineering design
- Carry out a topographic survey at every shortlisted structure site (levels, cross- and longitudinal sections).
- Calculate catchment yield, design peak flood and storage capacity for each structure.
- Prepare designs and drawings: plan, sections, dimensions, materials, foundation depth and spillway or overflow provision.
- For injection or recharge wells: depth, casing, screen position, filter design and silt-trap arrangement, based on the geophysical and lithological data.
- Follow applicable standards: CGWB Master Plan for Artificial Recharge to Groundwater, relevant Indian Standard codes, and the Common Guidelines for Watershed Development Projects / WDC-PMKSY 2.0 norms, or the State's own technical guidelines where these apply.
B3. Quantities and costs
- Prepare bills of quantities and cost estimates for each structure using the current West Bengal Schedule of Rates (PWD / Irrigation & Waterways, as applicable) and MGNREGA rates, where applicable.
- Summarise the budget by micro-watershed, structure type and implementation phase.
- Identify components suitable for convergence with government schemes (e.g., MGNREGA, WDC-PMKSY, Jal Shakti Abhiyan, Atal Bhujal Yojana where applicable).
B4. Expected impact and monitoring
- Estimate the additional storage and recharge volume, the area benefiting from irrigation and the households benefiting, for each structure and in total.
- Propose a monitoring framework: observation wells, measurement frequency, indicators and a simple data format the Foundation's field staff can maintain.
- Include an operation and maintenance plan, with roles for user groups and Gram Panchayats.
B5. Implementation and quality guidance
- Set out a phased implementation schedule that sequences works ridge to valley and fits the working season.
- Provide a quality supervision checklist for each structure type: critical dimensions, materials and stage-wise checks.
- Note risks such as land, siltation and water quality, with mitigation measures.
B6. Stakeholder consultation and presentation
- Present draft findings to the Foundation, Gram Panchayats and relevant government departments (e.g., Jhargram Zilla Parishad, Binpur-II Block Development Office, Water Resources Investigation & Development Department, Panchayat & Rural Development Department, Public Health Engineering Department).
- Incorporate feedback and support the Foundation in sharing the final DPR for planning integration.
Deliverables
All reports in English, in editable (Word/Excel) and PDF formats; all maps and spatial data as GIS files (shapefile/GeoPackage, WGS 84) with metadata. Payment is linked to TF's acceptance of each deliverable.
|
#
|
Deliverable
|
Key contents
|
Payment
|
|
1
|
Inception Report
|
Methodology, field plan, well and test-site sampling, team, work plan, QA
|
10%
|
|
2
|
Hydrogeological Characterisation and Micro-Watershed Report
|
Micro-watershed boundaries and drainage maps by stream order; thematic maps; well inventory; post-monsoon water levels; infiltration, geophysical and water quality results; aquifer typology and cross-sections; water balance; recharge-potential zonation
|
25%
|
|
3
|
Site Prioritisation Package
|
Ranked, GPS-tagged site list per structure type with justification; Gram Panchayat validation and land consent status; Year-1 priority sites flagged
|
(with 4)
|
|
4
|
Draft DPR
|
Structure-wise designs, drawings, BoQs and SoR-based estimates; budget by micro-watershed and phase; convergence mapping; impact estimates; monitoring, O&M and quality supervision plans
|
30%
|
|
5
|
Validation Presentation
|
Presentation of findings and draft DPR to TF, Gram Panchayats and district/block officials
|
–
|
|
6
|
Final DPR
|
Final DPR incorporating feedback, with annexures, drawings, GIS database, raw field data, photographs and a summary presentation
|
25%
|
|
7
|
Pre-monsoon Addendum
|
Pre-monsoon water levels from the observation network, seasonal fluctuation analysis and any resulting site revisions
|
10%
|