CONCEPT NOTE
Well-Based Piped Drinking Water Supply Scheme
Village: Kandawani (Talaidbara)
Gram Panchayat: Dhurkuta
Development Block: Samnapur, District Dindori, Madhya Pradesh
Beneficiary: 65 Baiga Families
1. Introduction
A well-based piped drinking water supply scheme is proposed to provide safe and regular drinking water to 65 Baiga community families residing in the Talaidbara area of Kandvani Village, under Samnapur Development Block, District Dindori.
At present, the families in the village depend on traditional water sources for their drinking water needs. During the summer season, these sources experience reduced water availability, resulting in drinking water scarcity.
The existing village well will be cleaned, protected, conserved, and developed as a sustainable drinking water source. Safe drinking water will then be supplied to 65 Baiga families through a piped water supply system. The project proposes an integrated development of the water source, pumping, storage, and distribution system.
2. Need for the Project
- Lack of regular and safe drinking water for Baiga families.
- Water scarcity during the summer season.
- Need for cleaning, protection, and development of the existing well.
- Dependence on distant water sources for drinking water.
- Risk of waterborne diseases.
- Need for a sustainable community-level drinking water supply system.
3. Main Objectives of the Project
- To protect, conserve, and develop the existing village well.
- To provide piped drinking water to 65 Baiga families.
- To develop a stand-post-based water distribution system for community use.
- To establish a safe water storage and pumping system.
- To develop a sustainable and safe water management system for the rural community.
4. Proposed Activities
(A) Source Development and Protection
- Cleaning of the well and removal of accumulated silt.
- Safety and protection works around the well.
- Improvement of the platform and drainage system.
- Ensuring cleanliness and protection of the water source area.
(B) Pumping and Electrical System
- Installation of 01 no. 2 HP submersible pump.
- Installation of 01 no. starter panel.
- Provision of approximately 40 metres of Texmo company cable.
(C) Water Storage System
- Installation of a 10 KL capacity PVC storage tank.
- Construction of a suitable platform for the tank and necessary pipe connections.
(D) Pipeline and Distribution System
- Laying of HDPE pipeline.
- Construction/installation of 15 stand posts.
- Development of a safe water distribution system for the community.
- Provision of necessary valves, fittings, and connections.
5. Major Project Components
|
S. No.
|
Work Description
|
Proposed Quantity
|
|
1
|
Beneficiary Families
|
65 Baiga Families
|
|
2
|
Stand Posts
|
15 Nos.
|
|
3
|
PVC Storage Tank
|
10 KL
|
|
4
|
Well Cleaning and Protection
|
01 Work
|
|
5
|
Submersible Pump
|
2 HP – 01 No.
|
|
6
|
Starter
|
01 No.
|
|
7
|
Texmo Cable – 4 mm
|
40 metres
|
|
8
|
HDPE Pipeline
|
As per requirement
|
|
9
|
Stand Post Fitting Material
|
15 Fitting Sets
|
6. Potential Benefits
Social Benefits
- Safe drinking water will be available closer to the households of the Baiga community.
- Time and physical effort spent by women and children in fetching water will be reduced.
- Improvement in hygiene and health conditions of the community.
Environmental Benefits
- Conservation and protection of the traditional water source.
- Increased utility and sustainability of the water source.
- Increased community awareness regarding water conservation.
Economic Benefits
- Reduction in the time and cost spent on fetching drinking water.
- Improved quality of life due to availability of water at the local level.
7. Community Participation
- Formation/activation of the Village Water and Sanitation Committee (VWSC).
- Community participation in the operation and maintenance of the scheme.
- Awareness activities related to water conservation, hygiene, and sanitation.
- Development of community-based rules for water use and management.
8. Sustainability
- Operation and maintenance of the scheme through the local community committee.
- Regular maintenance of the pump, pipeline, and storage tank.
- Provision for regular water quality testing.
- Community-based water source protection, monitoring, and management system.
9. Expected Outcomes
- Regular and safe drinking water availability for 65 Baiga families.
- Protection and improved utilization capacity of the existing well.
- Establishment of a safe and organized piped water distribution system.
- Improved long-term water security at the village level.
10. Conclusion
The proposed Well-Based Piped Drinking Water Supply Scheme in Kandvani (Talaidbara) will be an important initiative towards providing safe and regular drinking water to the tribal Baiga community.
The project will contribute to improving the health, hygiene, and quality of life of the rural community while also strengthening water source conservation and community-based water management. The development of the existing well, along with a sustainable pumping, storage, and distribution system, will help ensure reliable drinking water availability for the beneficiary families in the long term.
Along with the quote we need the following from the vendor as well which needs to be mentioned in the advertisement:
- PAN Card
- GST registration certificate
- MSME registration certificate (if applicable)
- Aadhar Card
- Three years income tax return